top of page
photo_2026-09-17_16-46-12_edited_edited.jpg
Our Projects

Recent projects — from a 40-year design life FPSO to a world-first moonpool plugging system.

Ichthys FPSO at sea with support vessels

Moonpool Plugging

Often our clients have everything they need to succeed — they just require the resources and support to make a strategic jump. We worked on this project for several years; the end result was a plugging system for FPSO moon pools. Working with a bespoke design and manufacturing team in Australia, we produced a world's first.

Ichthys FPSO

Since Pinnacle began in 2010, we assigned our Senior Marine Engineer to the Ichthys FPSO project — resolving complex issues for a 40-year design life, with exotic materials and prototype systems and equipment, to a world-class FPSO.

Moonpool plugging system prototype
Tandem offloading hose reel assembly

Tandem Offloading System

Involved in a tandem offloading system hose investigation following damage, we have assisted the client with a number of investigations and surveys. This has led to potential work for a full string changeout in the near future.

Karish FPSO — Commissioning

We were involved with the at-shore commissioning of the FPSO in Singapore, preparation for the tow to Israel and the installation of the FPSO at site.

FPSO vessel at sea
D-integra

Digital solutions for the maritime and offshore industry.

bottom of page